ProgramThursday, October 07th 2010
7:00 a.m. - 8:15 a.m. Registration 8:30 a.m. Welcome address by W. SCHUBERT
08:45 a.m. Leopold Müller Award
09:30 a.m. - 10:00 a.m. Coffee Break
Effects of ground water table fluctuation Chair: G. ZENZ S. KIEFFER
Gotthard Base Tunnel - Tunnelling in the influence zone of two concrete arch dams R. BREMEN Lombardi, Minusio (CH) H. EHRBAR AlpTransit, Luzern (CH) B. OTTO Axpo, Baden (CH)
Behaviour of Kops arch dam during tunnel excavation E. NETZER Vorarlb. Illwerke, Schruns (A) E. PÜRER Vorarlb. Illwerke, Schruns (A)
Considerations of the crack water table and its fluctuation in pressure tunnel design and construction A. VIGL Vigl Consult, Schruns (A) R. GERSTNER Vorarlb. Illwerke, Schruns (A)
Groundwater resources and the design and construction of deep tunnels in rock S. J. KLEIN Jacobs, San Francisco (CA, USA) J. WAGGONER Jacobs, Pasadena (CA, USA) T. HIBNER Metropolitan Water District, Los Angeles (CA, USA)
Landslides 2009 in Styria R. HORNICH Land Steiermark, Graz (A) R. ADELWÖHRER Land Steiermark, Graz (A)
Gmünd reservoir - Graseggerslope stabilization A. BLAUHUT Verbund AHP, Wien (A) A. LEOBACHER Verbund AHP, Wien (A)
Ermenek HPP - Groundwatertable development during impounding J. LINORTNER Pöyry Energy, Ankara (TR) R. KOHLER Pöyry Energy, Salzburg (A) G. JUNG Pöyry Infra, Wien (A) S. GÜVEN Pöyry Energy, Ermeneck (TR)
00:30 p.m. - 02:00 p.m. Lunch Break
Interaction between ground and TBM Chair: H. KÖHLER J. HERDINA
13m TBM-S without active support at the limit of use at the Tunnelkette Perschling D. BACH IGT, Salzburg (A) M. KÖPF STRABAG, Wien (A) J. LEMMERER ÖBB, Wien (A) N. SALCHER Viglconsult, Schruns (A)
Interaction between ground, closed shield TBM and segmental lining system A. GÖBL Porr, Wien (A)
Tapovan – Vishnugad Hydroelectrcric Power Plant – Experiences with TBM excavation under high rock cover J. BRANDL Geoconsult, Wals (A) V.K. GUPTA NTPC Limited, Noida (IN) N. MILLEN Geoconsult, Wals (A)
04:15 p.m. – 04:40 p.m. Coffee Break
Interaction between ground and TBM analyzed by machine data and rock mass parameters R. POISEL TU WIEN, Wien (A) E. TENTSCHERT A. PREH V. OSTERMANN W. CHWANTAL A. ZETTLER Zconsult, Villach (A)
Exploration Tunnel Aicha-Mauls at Brenner Base Tunnel – Working progress and results H. QUICK QUICK Ing., Darmstadt (D) E. FACCHIN BBT, Bolzano (I) K. BERGMEISTER BBT, Innsbruck (A) J. MICHAEL QUICK Ing., Darmstadt (D)
Using geomechanical calculations as a basis for assessing the interaction between TBM and rock mass K. KEIPER Lombardi, Minusio (CH) R. CRAPP F. AMBERG
08:00 p.m. Chamber Cancert The Province and City of Salzburg invite the participants and the accompanying persons to a chamber concert in the GROSSE AULA of the UNIVERSITY SALZBURG (Kapitelgasse 4-6). On the evening of Thursday, October 08th, 2009
Congress Dinner After the concert, the Austrian Society for Geomechanics invites all participants of the congress and accompanying persons to a dinner in the "Bräugasthof Sternbräu".
Friday, October 08th 2010
08:30 a.m. Beginning
Tunnelling in swelling ground Chair: A. LEITNER H. EINSTEIN
Approaches to technical solutions for tunnelling in swelling ground D. KIRSCHKE Ing.-Büro für Tunnelbau, Ettlingen (D)
Tunnelling in swelling rock - a solved problem? A. ZETTLER Zconsult, Villach (A) R. POISEL TU WIEN, Wien (A) A. PREH TU WIEN, Wien (A) H. KONIETZKY TU Bergak. Freiberg (D)
Swelling of sulfatic claystones - some fundamental questions and their practical relevance G. ANAGNOSTOU ETH Zürich (CH)
10:30 a.m. - 11:00 a.m. Coffee Break
Repair of the heaved section in the Chienbergtunnel using yielding supports F. CHIAVERIO Aegerter & Bosshardt AG, Basel (CH) A. TUTH Solexperts, Möchaltdorf (CH)
Brittle fracture in weak rock as trigger of swelling behavior: Qualitative evidence and analyses. W. STEINER B&S AG, Bern (CH) P. KAISER CEMI, Sudbury, Ontario (CA) G. SPAUN Müller&Hereth, Freilassing (D)
A9 Bosrucktunnel - design approaches for swelling rock F. LENZ ASFINAG, Liezen (A) T. MARCHER PGB ILF, Rum (A) T. NEUMAYR PGB IL, Salzburg (A)
00:30 p.m. - 02:00 p.m. Lunch Break
Geothermal Energie Chair: W. UNTERBERGER D. ADAM
The management of heat flow in deep mines H. WAGNER Montonuniversität Leoben (A)
Geothermal prediction for planned tunnels in the Andean Mountains, Chile/Argentina G. HÖFER-ÖLLINGER Geoconsult, Wals (A) B. MILLEN
Geothermal energy plants at major projects - design and construction H. HOFINGER iC Consulenten, Salzburg (A) W. UNTERBERGER R. MARKIEWICZ Getoech. Adam, Brunn/Geb. (A) D. ADAM
Use of warm water from the Lötschberg Base Tunnel Switzerland P. HUFSCHMIED ExTechNa GmbH, Spiegel/Bern (CH)
Design and construction of the geothermal application in the Jenbach tunnel S. FRODL Ed. Züblin AG, Stuttgart (D) J.-N. FRANZIUS T. BRATL ÖBB Infrastruktur AG, Vomp (A)
Deep geothermal energy plants - an interdisciplinary challenge - Shaft construction with 3D Collector heat exchanger system CH. MUSER Ehoch10/ste.p, Wien (A) H. HÄMMERLE Ehoch10/el-training, Wien (A) R. GALLER Montonuniversität Leoben (A) W. SCHUBERT TU Graz (A) |